Northside Community Civic Centre

Project Scope: Electrical, Mechanical and HVAC.

Unique to this project was the installation of an Ice Kube System which utilizes specialized heat pump equipment designed to operate at temperatures as low as -20° C (0° F).  Extracted heat from glycol  is used in the in floor heat system which heats the entire building.

Client: Northside Community Civic Centre Society
Duration: July 2010 - July 2011
Person Hours: ~23,000